15 Minutes To Stitch 2021 - Week 25
I loved participating in Kate's Life in Pieces 15 Minutes to Stitch since 2020 and am a fan of her blog. She's continuously hosted since 2011!
My 2021 goal is to stitch at least 15-minutes 50% of the days in the year.
- Week 25: 6 of 7 = 86 %
- 94 minutes/day average across 7-days
- June: 18 of 20 = 90 %
- 2021: 147 of 171 = 86 %
This week has been all about some new paradigm shifts. I can't exactly remember all the days of what happened. Working this past weekend on the dogs' state of mind. Found Nigel Reed's YouTubes on his "The Dog Guardian" method. His YouTube on Jazz looked promising for the issues I have with Osky (18-months old), so I bought the online video training program. What is incredible is that it may also help with persistent issues with Kipper (10-years old).
On the sewing front I feel compelled to continue after last Saturday's Quilt Guild class. The Cheerful Quilt by Andy Knowlton at abrightcorner.com.
So, how did the sewing go?
Top items with progress:
1) Cheerful quilt remaining 12 blocks progress towards completion:
All the squares had two lines drawn:
Sew squares onto the red and green color rectangles:
Press the triangles out and get ready to attach background skinny rectangles:
8 finished blocks still pinned to the design wall, waiting for the remaining 12 to then assemble the quilt top:
Updating Mini Archie's Fettle Those Finishes! to continue my focus for the Second Quarter of 2021.
Fettle Those Finishes! priority projects UPDATE (Q2):
- PBJ 2021 Color Challenge April (3 blocks) - DONE Q2
- Swoon Summer Festival Sling Bag for my sister - DONE Q2
- Secret Sewing Mondo bag for my sister (FAL #93) - DONE Q2
- PBJ 2021 Color Challenge May (3 blocks) - DONE Q2
- Secret blocks for Guild - DONE Q2
- Cheerful quilt - Preparation cutting for workshop - DONE Q2
- Guild Lottery block for Party - DONE Q2
- PBJ 2021 Color Challenge June (3 blocks)
- Cheerful quilt - IN PROGRESS
- Geo Grid quilt - 30 blocks for exchange - IN PROGRESS
- Geo Grid quilt - 12 bonus blocks for my quilt - IN PROGRESS
- Two Hold Tite Folio's for SewTites
- EPP Training Tablerunner - IN PROGRESS
- Honey Teddy Bear - IN PROGRESS
- Unicorn "Bear" - IN PROGRESS
- 2020 PBJ Monthly Color Challenge Assembly & Finish - IN PROGRESS
- 2021 EPP BOM Smitten - Months 1 & 2 & 3 & 4 & 5 - IN PROGRESS
- Journey2Nebula #2: Lucky Charm pillow
- Journey2Nebula #3: Jawbreaker
- Journey2Nebula #5: Candy Dish (2-for-1)
- Journey2Nebula #6: Gazebo
- Journey2Nebula #1: Seaside - Living room table runner - ON HOLD
- Journey2Nebula #4: Rock Candy - ON HOLD
- Journey2Nebula #8: Infinity Stones Throw - ON HOLD
- 2021 BOM Nebula - Blocks 1 & 2 & 3 & 4 & 5
- Fantastic Creatures fabric as Fabric Cafe's Byzantine Door Quilt #1 (FAL #1)
- Fantastic Creatures fabric as Fabric Cafe's Byzantine Door Quilt #2 (FAL #4)
- Fabric Roll as Happy Go Lucky (FAL #56)
- EPP training - Heart kit
- Pick a 2nd washable purse for myself (from FAL #5, 93, 96, 97, 98, 100, 101)
What are you working on?
Link-Ups:
- Life in Pieces Week 25 of 2021 - As #5
You've been moving along on your projects. Congrats on finding time to stitch. Hope that doggy training helps on multiple fronts.
ReplyDeleteThanks so very much. Everything is going better and better.
Delete