2020 Q2 Recap with FAL

Its fun to look back and review what's been accomplished over time.

Let's start with the 2020 Q2 Finish-A-Long quarterly structure, let's look at how this 'green' quarter went.

One thing was completed: My iPhone pouch, item number 121:



Progress has been made on several another project on the list:
Project #2 sandwiched and ready for quilting

As always other projects (DrEAMi/Squirrel) showed up and distracted me from THE LIST:
Hubby's Second Biking Phone pouch:

Homemade Mother's Day card:

Fabric Face Filters for friends and family

Quilty Thing Swap with a local quilt guild member, I made her a Bloem Basket and she made me a hand sewing station that I LOVE and posted here also:



Mug Rug out of a FMQ sample of Tula Pink's Bumble Fabric:


2 preparations for the WooliamGang Go Camping Trip:
Wigwam for Trixie and Sunny:


Trixie's overalls:

Two of the presents for my WooliamGangMidSummer swapee:
Custom gardening pouch for her family of mouselets:

Flamingo Wall Hanging:

Cut the rest (10) of the Batiks to have 12 months of colors for the swap; 20 each of 10-inch squares from 1.5-yards each.

Kept up on 3 sets of Block of the Month.

Started working on the 2020-2021 Quiltville Leaders/Enders Challenge (Easy Breezy) by making 19 block kits:

Started working on Thomas (ears first) also from the same panel as Trixie, her quilt, and the wigwam:

What can get done Next Quarter?

Comments

Popular Posts