StickyProdAlong2019 - Goals Update 25-Nov
UPDATE TO MY GOALS
MiniArchie is hosting IG's #StickyProdAlong2019 for finishing by the Holiday Season. Trixie and Sunny are taking sticks in hand and prodding me along.
Here's my updated list in priority order:
Completed items:
Cancelled items:
What do you need to finish before the holidays?
MiniArchie is hosting IG's #StickyProdAlong2019 for finishing by the Holiday Season. Trixie and Sunny are taking sticks in hand and prodding me along.
Here's my updated list in priority order:
- Finish setting up sewing room:
- Unpack final 3 boxes
- Trixie's twin sisters for Christmas delivery:
- Hand sew Trixie's twin sisters and their clothing
- Machine sew 2 'sleeping bags' for Trixie's twin sisters
- JAX MQG Mug Rug for 12/15 guild meeting
- Christmas round Tabletopper as Xmas present for Hubby by 12/24
- Hang Parasols on the Living Room wall across from the Front Door
Completed items:
- Finish Jelly Roll Rug sewing together and pressing and blog posting
- Finish Halloween QuiltSmart midi bag
- 3 rounds of IKEA furniture designing, buying, and handyman put together in Sewing Room
- Order & Assemble Cutting Table
- Unpacked 20 Sewing Room Boxes putting everything away
- Cricut practice cutting fabric on Carolina Moore's Sampler quilt
- Trixie's twin sisters: Design & cut with stitching lines on Cricut (took 25% of the time to make 2 than it took me to precision cut and hand draw the sewing lines on Trixie)
- Timeless Love Hugs hung on the wall above the bed after re-sewing the hanging sleeve in place with a gap for the hanger
Cancelled items:
- Can't attend due to work travel: Honeybee Quilters Guild Fabric Postcard for 12/3 guild meeting
What do you need to finish before the holidays?
Comments
Post a Comment