One Monthly Goal - October 2022 Completed and FAL 5th finish
The Slow-Along, 9 weeks to make ByAnnie's Catch All Caddy with weekly check-ins was the October 2022 goal. If you want to see everyone's finishes check them out:
If you are interested in a bag sew along or slow along with Randi Jones which I highly recommend, check out her links on her website HERE.
The bag kit from Renaissance Ribbons, Linework Ribbons, one fabric from the Parisville Deja Vu and a 1-yard bundle of Tula Pink's lineworks fabrics were used to make this Catch All Caddy v2.0. It is the biggest bag I have ever made and I'm so pleased! Linework Catch All Caddy v2.0 (FAL#57). You can see my proposal post HERE, which was #5 on the link-up at the beginning of the month.
This project was on the Finish Along list as item number 57 on the planning list HERE. This 5th finish for the quarter was posted to Instagram: @DawnyKquilts on October 29 #2022falq4finish.
What did you work on in October?
That looks amazing! Hooray for finishes *waves pompoms*
ReplyDeleteThank you so very much! I'm surprised that it took almost 22-hours to produce this bag. It's got inner dividers on 2-sides and outer pockets on all 4 sides. The time really adds up. *admires pompoms*
DeleteWhat cute projects!
ReplyDeleteThank you so very much, Sandy!
Delete