June and July Review / Furtle
As defined by Mini Archie, ‘Furtling’ means ‘having a rummage, a delve, a look at the contents of something’. So I have furtled around to see what I have been doing this month and now I’m going to furtle around the blogs of anyone else who links up over at Archie the Wonder Dog!
-Janine at Rainbow Hare on 2/28/2019
To socialize with my online crafty friends I'm linking up with Mini-Archie, one of my favorite online personalities, and his person for the monthly progress link-up from
Fettle Those Finishes!
Continuing weekly stats here for possibly linking up once a month with Kate at Life In Pieces. My 2021-2024 goal was to stitch at least 15-minutes 50% of the days in the year. Now, the goal is any number of minutes in a day for 50% of the year since I've got an almost 10-month old puppy. I want as much time with him to enjoy our time together.
- Week 22: 6 of 7 = 86 %
- 90 minutes/day average across 7-days
- Week 23: 7 of 7 = 100 %
- 51 minutes/day average across 7-days
- Week 24: 7 of 7 = 100 %
- 71 minutes/day average across 7-days
- Week 25: 7 of 7 = 100 %
- 82 minutes/day average across 7-days
- Week 26: 7 of 7 = 100 %
- 60 minutes/day average across 7-days
- Week 27: 6 of 7 = 86 %
- 70 minutes/day average across 7-days
- Week 28: 7 of 7 = 100 %
- 77 minutes/day average across 7-days
- Week 29: 6 of 7 = 86 %
- 37 minutes/day average across 7-days
- Week 30: 7 of 7 = 100 %
- 102 minutes/day average across 7-days
- Week 31: 2 of 4 = 50 %
- 24 minutes/day average across 4-days
- June 30 of 30 = 100 %
- July 27 of 31 = 87 %
- 2025: 184 of 212 = 87 %
June and July both had their challenges for me and my family. The puppy is finally 1-year old and full sized. We're working on teaching him to go upstairs on his own. It's a slow process to increase confidence. Big brother is sick and I'm having to carry each of a 38-lbs dog and a 33-lbs dog upstairs 3x/day when I go to my office to work.
Sewing continues to be my solace and I'm starting to be able to do more of it on a daily and weekly basis. Focus continues slowly on my projects planned in 2025 see my Furtle planning post
HERE.
Projects Half Done Progress update:
There were 52 projects already started before January 1, 2025 (up from 46 in 2024). The below screenshot of my projects from the spreadsheet provided (and a little expanded) by QuiltingGail is my 'official' list with reference numbers used throughout the year.
June:
July:

As of July 31st, 5 projects have been completed (Blue Highlight), 2 UFO's and 3 new projects. 0 projects completed this month (Green Highlight on completion Date), 0 UFO's and 0 new projects. 7 projects progressed in June and 5 projects progressed in July (Pink Highlight), 4 from UFO's and 3 new project.
How did sewing go?
June and July Projects Completed:
1) None. Keeping this space as a placeholder.
June and July Projects Progressed:
1) Moon Garden Smitten2 (2025 UFO 7): Block 6B completed and Block 6C assembly in progress. Smitten2 Month 6 in progress for 11-hours and 16-minutes out of 224-hours and 40-minutes on the entire quilt top of 16 Months.
(No photo of 6C in progress.)
2) Tula Pink's Alchemy Row 1 assembly continued during MQG meeting. Alchemy, a 2022 BOM, (2025 UFO 6) has Row 1 has progressed in 72-hours and 9-minutes out of 120-hours and 43-minutes on the entire quilt top so far. Example of the colors in this row:
3) & 4) Embroidery 101 has started with an Alphabet Sampler Page and January Stitches. I've started sewing on a couple test pages.
5) Honeybee Quilters guild workshop with Gail Renna of the Deb Tucker's Studio 180 Studio Abstraction pattern. Abstraction Quilt is 2025 Project 7 in progress for 44-hours and 46-minutes. Flimsy completed and shown at the guild meeting.
6) JAX MQG 2020 BOM + MQG 2025 Sew Along: All but the final 2 pieced blocks are ready for assembly. Need to design the final layout. This project is 2025 UFO 33 in progress for 39-hours and 5-minutes.
7) Easy Breezy twin size, Quiltville's 2020 Leader/Ender pattern (2025 UFO 4) - now have 90 blocks of the 180 needed for UFO, 98 blocks will be done when the kits at the sewing machine are completed. A tracking spreadsheet has been created for all the elements needed to assemble the top and figured it's 53% complete.
Loads of lovely progress in June and July, especially given all that’s going in elsewhere in your life. Thanks for Furtling!
ReplyDeleteThank you so very much!!! I love the Furtling for myself and others!!!!
Delete